Fast Track Gas to Power Project 40MMSCFD into 165MW in 7 Months
Largest flare-gas-to-power project in the Middle East to date, completed in seven months during COVID-19 lockdown, located in the Diyala Governorate.
Full Turnkey Solution
Concept development & negotiations with stakeholders
Drafting of novel & unprecedented Gas processing & Power rental contract
FEED, Project planning, door to door logistics, Importation and customs clearance
Life support & security
Civil, mechanical, electrical & instrumentation works
Raw associated gas pipeline
Gas process & power generation & transmission equipment supply
Local utility grid upgrade
Installation & commissioning of entire plant
Operation & maintenance of processing facility and power plant
Multi Stakeholder
Management
Ability to develop and deliver complex solutions across multi-stakeholder driven projects. Experienced in leading tri-party negotiations with the gas owner and utility operator, bringing extensive relationships with government departments and organizations to successfully implement multi-stakeholder contracts.
Heavy Lifting & Transport
Shipping (air & sea)
Land freight
Customs & duty handling
Specialist lifting and transport equipment
Land route planning and preparedness
1,200 container loads from 6 continents shipped to site during COVID 19 and suez canal crisis
Manpower & Technical Resources
We employ and rely on local skilled and technical manpower resources from the communities where we work
Life Support & Security
Own design, supply & operation of modular temporary site camps
Including catering, laundry, medical and full 24/7 life support
Design & supply of systems, security access, guard towers
In house security contractor management
B6 vehicle support
QHSE & Project Management
ISO 9001, ISO 14001, ISO 45001 certified
Veteran project managers implementing multiple, complex, in-country projects
Installation of Gas Infrastructure
Supply of API standard pipe material
Installed 7km of 16” pipeline (fast track)
Supply and installation of gas processing and conditioning equipment
Complete testing and certification of gas plant
Supply and installation of fuel lines to all generator packages
Gas Generators
180 MWe installed
1,250 kVA modular units x 200
LV and transformer network
Testing and commissioning power plant
Gas Treatment Unit
Slug catcher
Heat exchangers
Cold 3 phase separator
2 phase separator
Dehydration
Pressure reduction
Superheater
Gas metering
Full gas distribution
Condensate
loading
Enable tanker removal of liquid Natural Gas Liquids
Substations
Step up transformers 11kV - 132 kV
Transmission Infrastructure
Complete survey of local transmission grid consisting of:
40km of 132kV and 33kV overhead transmission lines
112 transmission towers
2 substations
Raw Gas Pipelines
New 6km raw gas pipeline from central oil production facility to power plant
New Transmission Lines - 7km
9 kV of new 33 kV overhead transmission lines
Modernize Existing
Transmission Lines
Providing conductor to upgrade existing 33km of 132 kV transmission lines
Total 198km of lines (for 6 conductors)
Existing tower integrity testing
Conductor upgrade from single circuit Lark to double circuit Teal (90 towers)
Interconnecting Switchyard
132 KV – 33 KV coupled with interconnecting transformers and EHV switching.
Supply and installation of 5 GSUs (Transformers)
50 mVA
Supply and installation of 132 kV EHV turning towers
Compliant with local utility provider